1. Construction project overview
1. Project name: Zhejiang J&J Mobility Co., LTD., annual output of 100,000 electric wheelchair production line technical renovation project
2. Construction nature: new construction
3. Construction location: Baiyang Avenue, Baiyang Industrial Development Zone, Wuyi Economic Development Zone, Jinhua City, Zhejiang Province (in Zhejiang Fanen Smart Home Co., Ltd.)
4. Construction content: project leasing wuyi economic development zone white industrial function of Zhejiang pan on intelligent household co., LTD. Factory, using carbon steel, aluminum, paint and other raw materials, cutting, welding, coating process, purchase spray painting line, spray line, laser cutting machine equipment, after the completion of the annual output of 100000 electric wheelchair production capacity.
2. Distribution of major environmental sensitive targets within the scope of EIA
Table 1 List of major environmental protection targets near this Project
order number	name	coordinate	Protect the content	Environmental functional area	Relative site orientation	Relative to the factory boundary distance
		east longitude	northern latitude
1	Wynn gold	119.867812°	28.935853°	settlement	Class II functional area	To the southwest	370m
2	Lower Chen village	119.877441°	28.931489°	settlement	Class II functional area	To the southeast	394m
3. Major environmental impact forecast situation
(1) Impact of atmospheric environment
According to the engineering analysis, during the normal operation of the project, the impact of the pollutants discharged by each pollution source on the sensitive points of the surrounding environment and the regional environmental air quality is within the acceptable range, and has little impact on the surrounding environment.
(2) Water environment impact analysis
Achieve rain and pollution diversion. After the production wastewater, the domestic sewage together with the Wuyi city sewage treatment plant, and finally discharged into the Wuyi River. Under normal circumstances, the wastewater discharged by the project will not impact the Wuyi city sewage treatment plant. Under the premise of reaching the standard discharge, the wastewater discharge will not have a significant impact on the final sewage body Wuyi River, and the water quality of Wuyi River can basically maintain the status quo.
(3) Noise impact analysis
According to the forecast, the noise contribution value of the noise generated by the project after sound insulation and distance attenuation can meet the requirements of the three standards in the Environmental Noise Emission Standard for Industrial Enterprises (GB12348-2008), which has little impact on the sound environment of the factory boundary and will not have a significant impact on the sound environment of the factory boundary.
(4) Solid waste impact
All kinds of production solid waste produced by this project can be properly treated, and it is not expected to have a significant impact on the environment.
(5) Environmental risk impact
Under the condition of good environmental risk prevention measures, the environmental risk of this project can be controlled, and the risk level of environmental accidents is acceptable.
Iv. Major environmental protection measures, environmental risk prevention measures and the expected results
Table 2. Main pollution prevention and control measures
classify	pollutant source	Pollutant project	Environmental protection measures	operative norm
exhaust gas	weld fumes	particulate matter	Strengthen the ventilation at the top of the workshop	It meets the unorganized emission standard in Table 2 of GB16297-1996 Comprehensive Emission Standard for Air Pollutants
	Throw pill dust	particulate matter	It is collected and treated through the cloth bag dust collector and discharged at high altitude	It meets the emission standard in DB33 / 2146-2018 Emission Standard for Air Pollutants in Industrial Coating Process and Table A in Appendix A of GB37822-2019 Dismission Control Standard of Volatile Organic Organics. Special emission limits of 1
	Spray plastic waste gas	particulate matter	Collect and recycle through filter element + bag dust removal device and lead to high altitude discharge
	Cure waste gas	Non-methane total hydrocarbon	The gas collecting hood is set above the drying opening
	Spray paint exhaust gas, drying exhaust gas	Non-methane total hydrocarbon, butyl acetate, odor	Spray paint waste gas after water curtain pretreatment and drying waste gas by the “cyclone tower spray + dry filtration + activated carbon adsorption and concentration + catalytic combustion desorption regeneration” treatment after high altitude discharge
	Gas flue gas	particulate matter, SO2、NOX, Lingman smoke blackness	After collection, it is discharged at high altitude along with the exhaust gas exhaust cylinder of the corresponding process	The Implementation Plan for Comprehensive Control of Air Pollution in Industrial Furnaces of Zhejiang Province no. 315,2019 and the corresponding standards in the Emission Standard of Air Pollutants in Industrial Furnaces (GB 9078-1996)
waste water	sanitary waste	CODcr 、NH3-N	After the septic tank pretreatment, it will be treated in the urban sewage treatment plant	It meets the tertiary standard of GB 8978-1996 Comprehensive Sewage Discharge Standard and the Indirect Discharge Limits of Nitrogen and Phosphorus Pollutants in Industrial Enterprises (DB 33 / 887-2013)
	factory effluent	CODcr, Petroleum, SS, LAS	A certain amount of dilute sulfuric acid and Fenton reagent were added to reduce the concentration of CODcr, and then the sewage treatment station of Zhejiang Fanen Intelligent Home Co., Ltd. for oil isolation, regulation, flocculation precipitation, sand filtration and other treatment and then the standard in the urban sewage treatment plant
noise	Operation of mechanical equipment and environmental protection facilities	 Equivalent continuous A sound level	Select noise reduction equipment, local sound insulation, add muffler and other facilities to high noise equipment air compressor, strengthen equipment maintenance.	It meet the GB 12348-2008 “Industrial Enterprise Environmental Noise Emission Standard”
solid waste	Collect the metal scraps and shot dust; recycle the collected plastic powder dust and reuse; entrust the sanitation department to clean the waste, waste residue, waste packaging bucket, waste activated carbon, waste catalyst and waste filter cotton.
 V. Preliminary conclusions of environmental impact assessment
The project conforms to the “three lines and one order” ecological environment zoning control scheme of Wuyi County, the relevant industrial national and local policies, and the site selection conforms to the overall planning and land use planning; the discharge of pollutants can meet the total access requirements, the pollutants have little impact on the local environment after treatment, and all environmental elements can maintain the existing functional requirements; the impact of project construction on the surrounding environment and environmental risks can be controlled within the acceptable range. Therefore, from the perspective of environmental protection, the project as long as the implementation of the eia proposed governance measures, the implementation of environmental protection investment, the strict implementation of the “three simultaneous” system, in the safety of production to ensure the pollutant emission standards, strengthen environmental management, the implementation of the project is feasible.
6. Method and duration of public access to eia documents
If the public need to consult the eia documents, please bring their ID cards to Zhejiang Xiao Environmental Technology Co., Ltd. or the construction unit within 10 working days of the announcement period. The public can also put forward suggestions or opinions on the project construction in the form of visitors, calls and letters.
7. Scope and object of soliciting public opinions
The scope and object of soliciting public opinions are the target public of environmental protection within the scope of environmental impact assessment.
 Viii. Specific forms of soliciting public opinions
 Take the form of the public display board around the project and the public website.
Time for publicity and public comment: From April 15 to April 28,2024.
9. Contact information of local environmental protection departments, eia units and project construction units
(1) Construction unit: Zhejiang J&J Mobility Co., LTD. Address: Wuyi Industrial Development Zone Baiyang Industrial Functional Zone Tel: 13858945519
(2) Eia unit: Zhejiang Xiao Environmental Technology Co., LTD. Address: Huanglong Third Road, Huanglong Industrial Zone, Wuyi Tel: 13857926129
(3) Examination and approval department: Wuyi Branch of Jinhua Ecological Environment Bureau Address: Third floor of Wuyi County Administrative Service Center Tel: 0579-87673710
Issued by: Zhejiang J&J Mobility Co., LTD
Release time: April 15,2024
Post time: Apr-15-2024
 
				